both should be doable.
Get us into the lab monday and we'll take a look.


On Fri, Oct 10, 2008 at 8:12 PM, Michael Collins <mcollins@fcnetwork.com> wrote:

Guys,

 

I've been using FS to troubleshoot a carrier issue. I need to roll patch cables as I try different circuits. I noticed that when I physically disconnect a PRI and plug it back in that the dchan stays down. A shutdown/restart of FS brings it back up.

 

Q1: Is there a way to have OZ try to bring the dchan back up after a layer 1 disconnect/reconnect?

Q2: Would it be horribly difficult to add a command like "oz bounce <span number>" for the sake of testing a circuit? (That is, doing a soft restart on the span instead of bringing FS all the way down and back up.)

 

Thanks!

 

-MC


_______________________________________________
Freeswitch-dev mailing list
Freeswitch-dev@lists.freeswitch.org
http://lists.freeswitch.org/mailman/listinfo/freeswitch-dev
UNSUBSCRIBE:http://lists.freeswitch.org/mailman/options/freeswitch-dev
http://www.freeswitch.org




--
Anthony Minessale II

FreeSWITCH http://www.freeswitch.org/
ClueCon http://www.cluecon.com/

AIM: anthm
MSN:anthony_minessale@hotmail.com
GTALK/JABBER/PAYPAL:anthony.minessale@gmail.com
IRC: irc.freenode.net #freeswitch

FreeSWITCH Developer Conference
sip:888@conference.freeswitch.org
iax:guest@conference.freeswitch.org/888
googletalk:conf+888@conference.freeswitch.org
pstn:213-799-1400