Hi,<br><br>I can't find much info on setting up a redundant or heavy load FreeSwitch implementation. Are there any <br>links apart from: <a href="http://wiki.freeswitch.org/wiki/Enterprise_deployment">http://wiki.freeswitch.org/wiki/Enterprise_deployment</a> ?<br>
<br>I imagine the entry level solution is to have two FS boxes configured identitcally, with <br>redundant SBC software (recommendations?) in front, passing the calls to the primary FS box,<br>or the backup FS box if the primary is not responding. Is that the easiest solution?<br>
<br>What about a situation of having a level of concurrent calls beyond what one FS box can handle? I realise<br>that would be a very large number of concurrent calls, but we would need a good plan on how to scale the <br>
systems.<br><br>Are there recommendations for load balancing solutions? Either soft or hardware?<br><br>My guess would be having 3 + 1 spare FS servers would work, where calls are distributed accross 3 FS boxes<br>by a load balancer with one spare in event of failure.<br>
<br>Also how would a FS box at max capacity behave? Does FS monitor available resources and reject the <br>excess calls that it can't handle? Or would the load balancer have to be configured with the maximum number<br>
of calls per box?<br><br>Would love to hear some experiences of deploying FS with failover & high load.<br><br><br>Thanks<br>Ash<br><br>